Chief Engineer Artemiev Yuriy
-
State Enterprise "Ilyichevsky Sea Trade Port". Reconstruction of berths No. 3,4 Ilyichevsky Sea Trade Port. (Working documentation).
- "Ilyichevsky Sea Trade Port." Reconstruction of berths No. 7,8 Illichivsky Sea Trade Port. (Working documentation).
- State Enterprise "Ilyichevsky Sea Trade Port". Cargo Pier at the junction of berths №№18,19. (Project, Working documentation).
- Replacing the overload equipment and the reconstruction of two berths of Sevastopol port (Project manager).
- Technical proposals for the construction of a new port in the city of Okakov.
- The work project of the embankment for the mooring of boats in the Kiev Oblogen Channel.
- National project to build a terminal for liquefied gas supplies to Ukraine (LNG-Terminal). (TEO).
- Construction of an experimental dam in Stakhanov. (RP, TEHNADZOR).
- Project of Berega-Strengthening about. Snake with gabion structures (in / s).
- Port Muuga (Estonia). Expert and technical supervision in the design of the container terminal. (RP).
- GP "Nikolaev maritime trading port". Analysis of damage in emergency situations at the piernes No. 9.11. (In / s).
- GP "Sea Trade Port South". Pier №27,27A, 27B for bulk and bulk cargo. (TEO).
- Port Aktau (Kazakhstan). Construction of a naval base for sludge ships and courts of the Navy Sun RK. (Work Project).
- Canal named after Satpayev (Kazakhstan). Multifactor examination of the technical condition of the dam number 87.
- Canal named after Satpayev (Kazakhstan). Renovation of dam # 87 (Work Project).
- Reconstruction of the pier number 7 of the Odessa Seaport (TEO, Project).
- Repair and rehabilitation works of the southern banking of the DP "Who", as the chief engineer of Dunaytransproekt LLC, as well as the author's supervision.
As Lead Engineer of ChernomorNIIproek
- Reconstruction of berths No. 3,4 of Ilyichevsk sea trade port - Detailed design
- Reconstruction of berths No. 7,8 of Illichivsk Commercial Sea Port - Detailed design
- Reconstruction of berths No. 1,2 of Ilyichevsk sea trade port - Detailed design
- Water disposal at berths No. 22,25 of the Odessa Commercial Sea Port - Detailed design
- Repair of the pier at the Odessa shipyard - Detailed design
- Creation of a two-level warehouse in the area of the Sevastopol port - Project
- Replacement of transshipment equipment and reconstruction of two berths of the Sevastopol port - Detailed design
- Bank protection of Zmeiny Island using gabion structures - Project
- Repair of berth No. 9 of the Nikolaev port due to an emergency ship heap - Detailed design
- Repair of berth No. 11 of the Nikolaev port - Detailed design
Chief Engineer of Proektgidrostroy LLC
- Bank protection and construction of a protective groin to create a beach area in the area of Odessa - Project
- Restoration of the beach area in the area of Koblevo village - Detailed design
- Dredging of the water area using the demolition of Dambovy Island in the Illichivsk Commercial Sea Port - Detailed Design
- Reconstruction of berths and transshipment capacities of Platonovskiy pier in the port of Odessa - Pre-design studies
- Implementation of technical and expert supervision during the construction of a dam at the Stakhanov Ferroalloy Plant
- Implementation of expert supervision in the design of the grain terminal in the port of Yuzhny by Royal Gasconing
- Implementation of technical and expert supervision in the design and construction of a container terminal in the port of Muuga (Estonia)
- Construction of berth No. 31 in the Yuzhny Commercial Sea Port - Pre-design studies
- National project for the construction of a terminal for the supply of liquefied gas to Ukraine - feasibility study
As Chief Engineer of Dunaitransproekt LLC
- Construction of the Grain Pier in the Illichivsk Commercial Sea Port - Project, Working Documentation
- Reconstruction of berths No. 17,18,19,20 in the Yuzhny Seaport - Pre-design studies
- Project for the safety of navigation and the creation of shunting zones during the construction of a grain pier in the Illichivsk Commercial Sea Port
- Construction of a new port in the area of Ochakov - Technical proposals, Pre-design studies
- Construction of an oil terminal in the Ilyicheskiy sea trade port - Pre-design studies
- Construction of a berth complex for transshipment of grain and liquid cargo in the Yuzhny Seaport (Berths 27, 27B) - Feasibility Study, Project
- Reconstruction of berth No. 7 of the Odessa Commercial Sea Port - Feasibility Study, Project, Working Documentation
- Reconstruction of the Bugsko-Dneprovsko-limansky canal - Detailed design
As Chief Engineer of Antares Platinum LLC (Kazakhstan)
- Multi-factor survey of dam No. 87, hydroelectric complex No. 4 of the Kanysh Satpayev Canal
- Reconstruction of dam No. 87, hydroelectric complex No. 4 of the Kanysh Satpayev Canal (Kazakhstan) - Detailed design
- Adjustment of the detailed design for the construction of a ferry crossing and berths of the port fleet in the port of Kuryk
- Construction of a narrow pier for basing ships and vessels in the port of Aktau - Detailed design
- Adjustment of the Working Design with a change in fundamental technical solutions for the construction of a narrow pier for basing ships and vessels in the port of Aktau
As Chief Engineer of Marineproject International LLC
- Repair and restoration work of the South Bank protection of the DP KTO
- Construction of rear storage areas of berths 1K and 2K DP СTO (HHLA). 1st stage. - Detailed design
- Construction of rear storage areas of berths 1K and 2K DP СTO (HHLA). 2nd stage. - Detailed design
- Construction of rear storage areas of berths 1K and 2K DP СTO (HHLA). Phase 2. - Detailed design
- Construction of rear storage areas of berths 1K and 2K DP СTO (HHLA). Phase 3. - Detailed design
- Increasing the throughput of the automatic passage DP KTO. Pre-design studies.
- Expert opinion on the state of coverage of the rear areas of berths No. 1K and 2K DP "CTO" (HHLA)
- Construction of a new container terminal with the expansion of railway capacities of DP "CTO" (HHLA) - Predesign studies.
- Reconstruction of the southern bank protection of the DP "CTO" (HHLA) - Detailed design.
- Project for the current repair of the cover of the rear areas of berths No. 1K and 2K DP "CTO" (HHLA)
- Project for the current repair of the covering of the rear areas of the berth No. 2K DP "CTO" (HHLA)
- Reconstruction of the rear storage areas of berth No. 38 in the Yuzhny Commercial Sea Port - Pre-design studies
- Construction of a universal transshipment complex on the territory of the Sea Trade Port of Chernomorsk - Predesign studies
- Construction of an automated warehouse for handling grain cargo at berth No. 14 of the Odessa seaport - Detailed design.
As a contracted Chief Engineer for various companies
- Construction of a container site on the territory of Euroterminal LLC at the address: Odessa, st. Khadzhibeyevskaya road, 4. - Detailed design
- Construction of berths No. 30.31 in the Yuzhny MTP. Pre-design studies
- Construction of the sea part of the grain terminal (Berth No. 30) in the port of Yuzhny. 1st, 2nd and 3rd stages of construction. - roject, Detailed design
- Reconstruction of berth No. 8 in the Nikolaev Commercial Sea Port - Project
- Repair of two breakwaters in the port of Batumi - Detailed design
- Performing a comprehensive calculation of the breaker wall in the area of 9st. fountain in Odessa - Detailed design
- Construction of an embankment for berthing boats in the Kiev bypass canal - Detailed design
Chief Engineer, Hydraulic EngineerDate of Birth: 19 July 1982 Town: Odessa |
Experience
Chief Engineer
01.01.2018 – Until now
Marineproject International LLC
Perform project documentation.
Implementation of project management.
Project maintenance at all stages.
Obtaining permits.
Support of passing examination.
Technical Director (Chief Engineer)
31.12.2015 – 31.12.2017 (2 years)
Dunaytransproekt LLC Ltd - Design of hydraulic structures
Perform project documentation.
Implementation of project management.
Project maintenance at all stages.
Obtaining permits.
Support of passing examination.
Chief Engineer
01.08.2015 – 31.07.2016 (1 year - contract work)
Antares Platinum LLP (Kazakhstan) - Design and Construction Company (Civil and Maritime Construction)
Perform project documentation.
Implementation of project management.
Project maintenance at all stages.
Obtaining permits.
Support of passing examination.
Technical Director (Chief Engineer)
01.09.2012 - 30.06.2015 (2 year 10 months)
PKF "ProjectHydrostroy" (design of hydraulic structures)
Implementation of project management.
Project maintenance at all stages.
Obtaining permits.
Support of passing examination.
Chief Hydraulic Engineer
06.2011 - 01.09.2012 (1 year 3 months)
PKF "ProjectHydrostroy" (design of hydraulic structures)
Assistant and deputy chief engineer.
Calculation and design of hydraulic structures.
Preparation of contractual documentation.
Negotiating with customers.
Preparation of permits.
Kipia Engineer, Sales Manager
05.2010 - 05.2011 (1 year)
NPKP PHOTRIKA LLC (trade in the production of gas production "ENDRESS + HAUSER)
The expansion of the customer base.
Development of the southern region of Ukraine.
Work with kipia devices.
Conducting presentations for work with equipment.
Work with customers.
Preparation of contractual documentation.
Leading Engineer Department of Hydrotechnical Facilities
08.2004 - 05.2010 (5 year 9 months)
ChernomineyProject (Design)
Calculation and design of hydraulic structures.
Education
Higher
12.2007 - 12.2011
Odessa National Sea University, graduate school, foundations and foundations., Odessa.
Thesis topic: "Getting the maximum cost savings in the construction of subtle retaining walls with a immersion of various types of metal tongs" comb ".
Higher
09.1999 - 06.2004
Odessa National Maritime University, Water and Transport and Owl Facility, Odessa.
Additional education
2005, 1 week - calculation and design of Maccaferri's Gabion structures
2009, 1 week - the development of anSys software complex
2009, 2 weeks - SCAD 11.3 Software Development
2010, 1 week - Central office "Endress + Hauser" (Switzerland).
Lecture course:
Studying the work and action of pressure and level sensors (France)
Studying the work and action of temperature sensors (Italy)
Studying the principles of operation of flow meters of various types (Germany)
Professional skills
Computer skills, by
MS Windows, MS Office;
Graphic programs: AutoCAD, Nanocad;
Estimated programs: Software complex SCAD 13.1, Lira9.4, Plaxis 9.0, Purs, Bolverk, Prosheet 2.2, Geoslope, Macra1, Gavacwin, MacStars 2000.
Owing languages
Russian — expert
English — expert
Ukrainian — expert
French – medium (with a dictionary)
Hydraulic engineer Panasyuk E.A.
- The project of creating a berth complex for transshipment of grain and liquid cargo in the Yuzhny Seaport (Ukraine)
- Feasibility study for the reconstruction of berth No. 7 of the Odessa Sea Trade Port (Ukraine)
- Reconstruction project of berth No. 7 of the Odessa Sea Trade Port (Ukraine)
- Multifactorial survey of dam No. 87, hydroelectric complex No. 4 of the Kanysh Satpayev Canal (Kazakhstan)
- Detailed design for reconstruction of dam No. 87, hydroelectric complex No. 4 of the Kanysh Satpayev Canal (Kazakhstan) - project implementation in 2017
- Detailed design of a narrow pier for basing ships and vessels in the port of Aktau (Kazakhstan)
- Correction of the Working Design with a change in fundamental technical solutions for the construction of a narrow pier for basing ships and vessels in the port of Aktau (Kazakhstan. Performed at the request of the Customer).
- Detailed design for the reconstruction of the fencing of storage areas No. 1-7 in the port of "Kherson".
- Repair and restoration works of the South Bank protection of DP KTO (Ukraine)
- Detailed design for the object "Dredging for the reconstruction of the operating water area of berth No. 21 IFGP USPU"
- Construction of rear storage areas for berths 1K and 2K of DP KTO. 1st stage. Working documentation (Ukraine)
- Construction of rear storage areas for berths 1K and 2K of DP KTO. 2nd stage. Working documentation (Ukraine)
- Construction of a grain terminal (Berth No. 30) in the port of Yuzhny. 1st, 2nd and 3rd stages of construction. Project (Ukraine)
- Reconstruction of berth No. 7 of the Odessa seaport. Working documentation. (Ukraine).
- Development of working documentation for carrying out work on the current repair of the coverage of the territory of berths 1K, 2K of the Quarantine jetty.
- Development of design and technical documentation for the performance of work on the current repair of the refrigerating platform of the DP "CTO".
- Detailed design for the reconstruction of the South Bank protection of DP KTO (Ukraine).
- Reconstruction of the Bugsko-Dnieper-Limansky Canal
- Pre-design studies for the project “Construction of a container terminal with the expansion of the railway. capacities of DP "CTO"
- Detailed design for the object "Construction of a container site on the territory of Euroterminal LLC"
- Proposals for the construction of a universal transshipment complex on the territory of the seaport "Chornomorsk".
- Pre-design studies for the construction of a unitized cargo transshipment complex for State Enterprise MTP Yuzhny (berth 38).
- Pre-design studies, preliminary technical and economic assessment of the construction of a deep-water commercial seaport in the Berezansky estuary of the Ochakovsky district of the Nikolaev port.
- Detailed design of the embankment for mooring boats on the Kiev bypass channel.
- Construction of rear storage areas for berths 1K and 2K of DP KTO. Phase 2. (Phase 3.4) Working documentation (Ukraine)
- Construction of rear storage areas for berths 1K and 2K of DP KTO. Phase 3. (Phase 5.6) Working Documentation (Ukraine)
- Technical solutions for modernization of a hangar for servicing large-sized equipment
- Reconstruction of part of the building of warehouse No. 14, open cargo area at the rear of warehouse No. 14.
- Increase in the throughput of the automatic passage DP "CTO" (feasibility study)
- Landscaping project of OSBB "Mriya"
- Increasing the throughput of the automatic passage DP "CTO" (Working documentation)
- Increasing the throughput of the automatic passage DP "CTO" (correction)
- Inspection of the technical condition of the Northern shore protection of berths 1K-2K.
Личные данные:
Дата рождения: 03.05.1991г.
Проживание. г. Одесса.
Образование:
-Одесский учебно-воспитательный комплекс №90;
-ДПТ «Одесский профессиональный лицей строительства и архитектуры» (специальность – строительство);
-Одесский национальный морской университет (гидротехническое строительство).
Виды выполняемых работ:
Проведение расчетов, разработка технических решений, проектов организации строительства, исполнительной документации, сопровождение строительства, осуществление авторского надзора.
Опыт работы:
-с 2018 г. по настоящее время, ООО «Марин проект интернешнл», должность инженер-гидротехник, проведение расчетов, разработка и сопровождение проектной документации, проектов организации строительства, сопровождение строительства, осуществление авторского надзора;
-2016 г. – 2018 г. ООО «Дунайтранспроект», должность инженер-гидротехник, проведение расчетов, разработка и сопровождение проектной документации;
-2014 г. – 2015 г. ООО «Проектгидрострой», должность инженер-гидротехник, проведение расчетов, разработка проектной документации.
Навыки работы с компьютером, ПО:
Знання ПК (програми, рівень):AUTODESK AUTOCAD, ROBOT, PLAXIS 2D, SCAD, MS WORD, MS EXEL, MS POWERPOINT, SKETCH UP, Revit
Владение языками:
русский (свободное)
украинский (свободное)
английский (базовое)
немецкий (базовое)
Повышение квалификации:
-повышение квалификации по специальности инженерно-строительное проектирование (общий модуль). ООО «Центр повышения квалификации «ЕВРОПРОЕКТ»;
-повышение квалификации по специальности инженерно-строительное проектирование (Специальный модуль – Обезпечение механического сопротивления и стойкости). ООО «Центр повышения квалификации «ЕВРОПРОЕКТ».
Общественные организации:
Саморегулируемая организация в сфере архитектурной деятельности Всеукраинская общественная организация «Гильдия проектировщиков в строительстве»
CHIEF ENGINEER EMELYANOVA TATYANA
- Reconstruction of buildings and structures of ChMP, IMTP.
- 10-16-storey, nine-section residential building on the street. 25th Chapaevskaya div. M. Zhukov's corner
- 14-storey three-section residential building in the village. Khlebodarskoe
- 15-storey Business - center in Ilyichevsk on the street. Korabelnaya
- Private residential buildings and cottage settlements
- Engineering works: Investigation of the technical condition of load-bearing and enclosing structures of buildings of the recreational and recreational complex "Yubileiny" with.
- Development of solutions to restore the bearing capacity of structural elements.
All employees of our company have passed special training and advanced training. Experience in leading design institutions allows us to confidently take on the implementation of projects of any level of complexity. We are optimistic about the future and are open to the discussion of all the wishes of our customers.