Current repairs of the refrigerated platform of the DP "CTO"
The complex of repair construction and installation works on the refrigerated platform of the Subsidiary Enterprise "CTO" has been completed.
The work was carried out on the basis of the completed design and technical documentation. For the service of refrigerated containers, bridges were erected, which are a metal four-tiered structure, at the request of the Customer, made of available materials, equipped with panels for connecting refrigerated containers and power cabinets. The Ederer crane was reconnected, cables and wires were re-laid, a set of works on the installation of low-current communication channels was completed.
The track covering of one of the RTG legs is made of reinforced concrete slabs 18 cm thick, the other is made of asphalt, which serves as a leveling layer, arranged on the existing reinforced concrete slabs. The section of the technological passage of specialized transport and other structurally necessary places are made of a monolithic covering with a thickness of 22 cm.