Our company carried out a set of works to repair the coating of berths 1k - 2k on the basis of the completed technical documentation.
As part of the current repair, the coverage was restored in the entire rear area of the berths. For temporary storage of containers, an area for temporary storage of containers with a coating of reinforced concrete slabs 14 cm thick with prestressed reinforcement has been arranged.
The hatches of engineering networks were raised, and a set of works on the construction of a drainage system from the territory adjacent to the existing transformer substation was carried out.